General Project #9

Complete overhaul of the entire house, including two dormer extensions

♦️ Execution is listed below;

• Demolition Assignments;
• Removal of load-bearing wall structures
• Installation of new floor / wall tiles
• Installation of a suite bathroom & double sink outlet & walk-in shower
• Installation of furniture
• Installation of electrical units
• Installation of LED Lightning throughout
• Installation of Recessed ceilings
• Installation of skirting boards
• Installation of plasterboard constructions / OSB plates
• Installation of a new CV Boiler
• Installation of new heating units, radiators throughout
• Painting all of the brand new doors in matte black
• Installation of brand new wooden stairs, including built-in lightning outlets
• Installation of brand new windows
• Structural layout adjustments
• Levelling off walls / floors
• Plastering Assignments (including preparation assignments)
• Painting Assignments (including acrylic kit, preparation assignments)
• Sanitary ware / electrical ware circuit extraction, water supply, heating milled pipes, extraction of electrical circuits, additional groups / sockets / switches
• Flooring assignments
• Isolation assignments carried out throughout the extension
• Installation of brand new kitchen, water supply & electrical extensions and such
• Installation of underlayment construction
• Taking constructional waste out
• Supplying materials
• An official warranty up to 10 years for the work executed by our crew