Complete renovation of the entire property

♦️ Execution is listed below;

• Demolition Assignments;
• Removal of load-bearing wall structure
• Installation of new floor / wall tiles
• Installation of new sink / walk-in shower
• Installation of suite bathroom
• Wooden-based restoration assignments
• Installation of furniture
• Installation of electrical units
• Installation of LED Lightning (specified areas)
• Installation of Recessed ceilings
• Installation of skirting boards
• Installation of plasterboard constructions / OSB plates
• Installation of a new CV Boiler
• Installation of new heating units, radiators throughout
• Installation of a see-through wine cellar in the kitchen
• Installation of windows
• Structural layout adjustments
• Levelling off walls / floors
• Plastering Assignments (including preparation assignments)
• Painting Assignments (including acrylic kit, preparation assignments)
• Sanitary ware / electrical ware circuit extraction, addition of groups / switches /
• Flooring assignments
• Installation of underlayment construction
• Taking constructional waste out
• Supplying materials