Skip to main content

Bathroom Project #13

♦️ Execution is listed below;

• Demolition Assignments;
• Installation of new floor and wall tiles
• Installation of new sink outlet & bathtub & shower enclosure
• Installation of a brand new window
• Creation / Installation of niches inside of the wall
• Installation of built-in toilet & LED mirror lights
• Installation of furniture
• Installation of brand new lightning
• Interior adjustments
• Levelling off walls / floors
• Plastering Assignments
• Painting Assignments
• Taking constructional waste out
• Supplying materials