Skip to main content

Bathroom Project #05

Amazing bathroom overhaul throughout, merging modern take and clients vision to reach the highest desired results!

♦️ Execution is listed below;

• Demolition Assignments;
• Installation of new floor / wall tiles
• Installation of new sink / walk-in shower
• Installation of electrical underfloor heating
• Installation of furniture
• Installation of LED spotlights
• Installation of Inbound toilet
• Interior adjustments
• Levelling off walls / floors
• Plastering Assignments
• Painting Assignments
• Taking constructional waste out
• Supplying materials