General Project #03
Complete Bathroom / Living room renovation carried out!
♦️ Execution is listed below;
• Demolition Assignments;
• Removal of load-bearing wall structure
• Installation of new floor / wall tiles
• Installation of new sink / walk-in shower
• Installation of furniture
• Installation of electrical units
• Installation of LED Lightning throughout
• Installation of Recessed ceilings
• Installation of skirting boards
• Installation of plasterboard constructions / OSB plates
• Interior adjustments
• Levelling off walls / floors
• Plastering Assignments (including preparation assignments)
• Painting Assignments (including acrylic kit, preparation assignments)
• Sanitary ware / electrical ware circuit extraction, addition of groups / switches /
• Flooring assignments
• Installation of underlayment construction
• Installation of the furniture
• Taking constructional waste out
• Supplying materials
• An official warranty up to 10 years for the work executed by our crew